What actually happens when you hire an interior designer
Updated: Oct 15
Most people have never worked with a designer before, which makes the first step harder than it needs to be. You do not know what you are agreeing to, how long it will take, how much of your own time it will absorb, or what happens if you change your mind halfway through.
So here is the process laid out plainly. The shape is much the same across the industry, though the depth of each stage scales with the size of the project.
Before anything starts: the first conversation
Every project begins with a conversation about how you live and what you want the space to do. Not what style you like, at least not first. How many people use the room, what time of day, what currently frustrates you, what you would never give up.
This is also where budget gets discussed, and it is worth being direct about it. Designers are not trying to find out what you can afford so they can spend it. They are trying to work out whether what you want and what you want to spend are in the same neighbourhood, because if they are not, it is better to know in the first hour than the third month.
For smaller projects this conversation may be the whole engagement. A consultation, some clear direction, and you carry it out yourself.
Stage one: understanding the space
The designer measures, photographs and assesses what is there. On a remodel or new build this means working from the plans. On a furnishing project it means knowing exactly what fits, where the outlets are, which way the light falls and what the traffic paths are.
It sounds procedural and it is the stage that prevents most expensive mistakes. Nearly every furniture disaster traces back to a measurement nobody took.
Stage two: the plan
This is where the design actually happens. Depending on the project it can include space planning and layouts, elevational drawings, renderings, finish and material selections, cabinetry and built-in design, lighting plans, and furniture selections.
You will usually see the concept presented rather than emailed piecemeal: materials together, furniture in context, so you can judge how the whole thing works rather than approving items one at a time. Judging a sofa in isolation is nearly impossible, which is why good presentations show everything together.
Expect to give feedback here, and expect it to be specific. What you like is helpful. What you do not like is more helpful. A designer can work with a clear objection far more easily than with polite agreement followed by hesitation later.
Stage three: sourcing, ordering and purchasing
Once the plan is approved, everything has to be found, priced, ordered and tracked. This is the least glamorous part of the process and often the largest share of the hours.
It is also where a designer earns their keep in a way that is invisible from the outside. Lead times vary from a fortnight to six months. Items get discontinued between specification and order. Deliveries arrive damaged. Someone has to be tracking all of it against a schedule, and if that person is not the designer, it becomes you.
Designers also have access to suppliers who sell only to the trade, which widens what is available beyond what you can buy at retail.
Stage four: coordination with the trades
On anything involving construction, the design has to reach the people building it. That means specification sheets, drawings and finish schedules the builder and subcontractors can work from, and answers to the questions that come up on site.
How this runs varies by project. Sometimes the designer works with the trades directly. More often the information goes through your contractor, who passes it along. Either way the point is that the details reach the right people without you having to relay them, which is a job nobody wants.
Stage five: installation and styling
Everything arrives, gets placed, and the space gets finished properly: art hung, lighting adjusted, the last layer of accessories added. On a full project this is often done in a single push so you walk into a finished room rather than watching it assemble over weeks.
This final stage is the one clients most often underestimate and most often remember. It is the difference between a room containing the right furniture and a room that feels complete.
How long the whole thing takes
Honestly, longer than most people expect, and the reason is usually not the design work.
A single room refresh can move in a few weeks if the pieces are in stock.
A whole-home furnishing project typically runs several months, driven mostly by furniture lead times.
A remodel follows the construction schedule, and construction schedules move.
A new build follows the builder, which can mean a year or more from first conversation to final styling.
The design stages themselves are rarely the bottleneck. Lead times and construction are. A good designer tells you this at the start rather than at month four.
What is expected of you
Less than people fear, but not nothing.
Honest answers at the start about how you live and what you want to spend.
Timely decisions. Delays at approval stages push everything downstream, particularly when lead times are long.
Access to the property when needed.
Saying so when something is not right, early rather than late.
Working with Tamtam Design & Realty
Every project is led by Tamarah Kronaizl, who has been designing homes since 2011 and works across Omaha, Elkhorn and the surrounding metro. You work with her directly rather than with a rotating team, and the process is scaled to the project rather than applied wholesale to a single room.
If you are not sure whether you need the full service or just some direction, that is exactly what a first conversation is for. Call (402) 235-8276 or email info@tamtamdesignrealty.com.
Frequently asked questions
Can I change my mind partway through?
Within reason, yes, and most designers expect some of it. The cost of changing depends on when. Changing a furniture selection before it is ordered is straightforward. Changing a cabinetry layout after it has been built is expensive, which is why the approval stages exist.
Do I have to be involved day to day?
No. Most of the process runs without you, which is the point. You are involved at the beginning, at the presentation and approval stages, and at the end.
What if I only want part of the process?
That is a common arrangement. Some clients want the design and plan to execute it themselves. Others want the whole thing handled. Both work, they are just scoped differently at the start.
When should I bring in a designer on a new build?
As early as possible, ideally while you are still reviewing plans. The decisions with the biggest effect on how the finished house works are made before construction begins, and they are the hardest to change afterwards.